AI Diesel Tech

SPN 658 FMI 5 — Injector Cylinder 8 Circuit Open

SPN 658 FMI 5 — Injector Cylinder 8 Circuit Open

SPN 658 FMI 5 means the ECM detected an open or low-current condition on the cylinder 8 injector driver circuit. Cylinder 8 rear-bank connectors are often disturbed during turbo or aftertreatment service — connector re-lock verification is the mandatory first step.

SPN 658 FMI 5 — Injector Cylinder 8 Circuit Open — diesel diagnostic illustration

Fault Overview

FMI 5 on the cylinder 8 injector circuit indicates the ECM detected missing or below-threshold current rise during commanded injection. Unseated connector, open wire, failed injector, damaged pass-through, and corrosion are the primary causes. Repeat opens after incomplete connector engagement under valve covers are a documented pattern on rear-bank cylinders. Harder-access rear-bank connectors are often disturbed during turbo or AT service on some engine packages — a disconnected connector after service is the most efficient first check.

Engine & Platform Coverage

V8 electronic diesel enginesAny platform with cylinder 8 injection controlDuramax V8 applicationsPower Stroke V8 applications

Symptoms

  • •SPN 658 FMI 5 cylinder 8 injector open
  • •Cylinder 8 dead miss or no contribution
  • •V8 injector circuit fault
  • •Rough running under load
  • •Increased soot from misfiring cylinder

Possible Causes

  1. 1.Unseated connector — connector not fully engaged at cylinder 8 injector
  2. 2.Open wire — wire break in cylinder 8 injector circuit
  3. 3.Failed injector — internal injector open
  4. 4.Damaged pass-through — pass-through terminal damage at valve cover
  5. 5.Corrosion — connector corrosion from oil or moisture intrusion

Diagnostic Flow — FSM Sequence

AI Diesel Tech enforces this evidence-gate sequence. Each gate must pass before advancing.

6 steps locked behind Technician Mode
  • 1
    Single Action Gate — Rear-Bank Connector Access and Lock Confirmation: Access the cylinder 8 rear-bank connector and confirm lock engagement. Harder-access rear-bank connectors are often disturbed during turbo or AT service. Confirm the connector is fully latched and the lock tab is engaged before any electrical measurements. A disconnected connector after service is the most efficient first check.
  • 2
    Binary Decision Gate — Resistance Check: Measure injector resistance at the cylinder 8 connector. An OL or high resistance reading confirms an open circuit. Compare to OEM injector specification. A resistance within specification with a confirmed open circuit code confirms a harness fault between the connector and the ECM.
  • 3
    Override Manager — Continuity to Controller: Verify continuity from the cylinder 8 injector connector to the ECM injector driver connector. A continuity failure confirms a harness break. Inspect harness near valve cover edges, brackets, and pass-through terminals for the break location.
  • 4
    Safety Interceptor — Verify No Short Before Re-Actuation: Verify no short-to-ground or short-to-power exists before re-actuating the injector driver. A short in the circuit can damage the ECM injector driver. Confirm circuit integrity before any injector actuation tests.
  • 5
    Resume Point — Component Decision After Circuit Proof: Proceed to injector replacement only after circuit integrity is confirmed and internal injector open is proven. A harness with confirmed continuity and a connector with confirmed seating that still shows OL resistance at the injector pins confirms an internal injector open.
  • 6
    Verification Loop — Post-Repair Contribution Confirmation: After repair, verify cylinder 8 contribution returns to normal. Confirm SPN 658 FMI 5 does not return. Monitor for return of misfire or rough running under load.
  • 7
    Repair Ledger Output — Connector, Harness, or Injector Decision: Re-seat or repair connector if disconnected or damaged. Repair harness break if found. Replace injector only after internal open is confirmed. Do not replace injector for a connector or harness fault.

Unlock the full evidence-gated diagnostic sequence, DVOM test steps, and repair procedures in Technician Mode.

Repair Steps

1 steps locked
  • 1Re-seat or repair cylinder 8 injector connector.
  • 2Repair harness break at valve cover edge, bracket, or pass-through.
  • 3Replace injector only after internal open is confirmed.

Unlock full diagnostic steps, DVOM tests, and repair procedures.

Full Diagnostic Access

Verification steps, preventative measures, severity guidance, and legacy comparison are available in Technician Mode.

Start Diagnosing This Fault Now

AI Diesel Tech walks you through every evidence gate in the correct order. Choose the plan that fits your shop.

Related Resources

Related Fault Codes

Related Systems

AI Diesel Tech — The Technician's Diagnostic Engine

AI Diesel Tech diagnostic logic is built by an ASE Certified Diesel Technician and engineered for professional shop use. Trusted by technicians nationwide — used in shops, fleets, and training programs.

Summary

Cylinder 8 open follows the same circuit-to-component sequence as other injector open codes. The AI Diesel Tech FSM prevents bank-wide injector replacement for one circuit fault.

Enter Technician Mode

DVOM tests · repair steps · full access